Help me choose.
Backup power
What will actually keep this running?
How this is worked out
Duty cycle. A fridge is not drawing 150 W for twelve hours — its compressor cycles. A duty factor is applied per appliance. Multiplying straight through overstates a fridge roughly threefold, which is how most sizing answers end up two rungs too big.
Surge. One motor starts at a time, the realistic worst case. Peak demand is the continuous load plus the largest single startup, not every surge at once. For anything with a compressor it is the surge, not the running watts, that decides whether it starts at all.
Losses. Inverter and conversion efficiency 88%. Usable capacity 95% of nameplate, reflecting the reserve the BMS holds back on LFP cells.
Solar. Kuala Lumpur averages 4.5 peak-sun hours a day — the Global Solar Atlas figure, not a vendor one. A ground-propped folding panel yields about 62% of its rating once heat, tilt and soiling are counted.
The monsoon correction. On a heavy-rain day output falls to roughly a quarter of clear sky. Solar is weakest during exactly the storm that takes the grid down, so no daily top-up is assumed during an outage.
Rooftop solar
What solar would do to your bill.
NEM closed on 31 December 2025. Under Solar ATAP an exported unit is worth about 57% of one you use yourself, and surplus past your own monthly bill is forfeited — so sizing works differently now, and bigger is not automatically better.
Tariff and solar assumptions
Tariff. TNB Domestic Tariff A under RP4. Every component below is a theme setting — the Automatic Fuel Adjustment is revised monthly by Suruhanjaya Tenaga and must be updated without a developer.
Generation. 3.61 kWh per kWp per day for Klang Valley — the Global Solar Atlas PVOUT figure, which already includes system losses. A modelled satellite value, not a brochure number.
Self-consumption. Capped by how much load exists in daylight, not a flat percentage. Malaysia makes the empty-house case worse than European benchmarks because bedroom aircon runs 9 pm to 7 am — almost entirely outside the generation window.
Export and forfeiture. Solar ATAP credits domestic exports at the energy charge only. Anything not offset within the same billing period is forfeited, and export credit cannot offset the fuel adjustment.
Already on NEM? Do not switch. Joining ATAP requires terminating an existing NEM contract, and NEM credited exports one-for-one.
Questions? Answers.
Why does it recommend a smaller unit than I expected?
It says a unit has the power but not the runtime. What does that mean?
Why is startup surge treated separately?
Can solar keep it topped up through an outage?
Where do the solar payback figures come from?
Why does the recommended solar system stop at 5 kW?
I am already on NEM. Should I switch to ATAP?
Can I talk to someone instead?
Buying from the official distributor
Official distributor
Real stock, real serial numbers
True Colour Media Group Sdn Bhd is EcoFlow's appointed distributor for Malaysia. Every unit is sourced through EcoFlow, not parallel-imported.
Warranty
Claims handled here, not shipped abroad
Warranty policy ›Two years on the unit and five on the LFP battery, serviced locally.
Still not sure
Tell us the load and we will size it
Talk to us ›Anything involving a transfer switch, a three-phase supply or a business load deserves a conversation rather than a slider.
